Flexible jobshop scheduling problem with resource recovery constraints.
Objectives and methods of study: The general objective of this research is to study a scheduling problem found in a local brewery. The main problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times, resource constraints, precedence relationships, and capa...
Main Author: | |
---|---|
Format: | Tesis |
Language: | English |
Published: |
2017
|
Online Access: | http://eprints.uanl.mx/14088/1/1080242220.pdf |
Search Result 1
Flexible jobshop scheduling problem with resource recovery constraints.
Published 2017
Get full text
Tesis