Flexible jobshop scheduling problem with resource recovery constraints.

Objectives and methods of study: The general objective of this research is to study a scheduling problem found in a local brewery. The main problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times, resource constraints, precedence relationships, and capa...

Descripción completa

Detalles Bibliográficos
Autor principal: Vallikavungal Devassia, Jobish
Formato: Tesis
Lenguaje:English
Publicado: 2017
Acceso en línea:http://eprints.uanl.mx/14088/1/1080242220.pdf