Resultados de búsqueda - ((testlets OR gtesteeoa) OR ((esto OR (testeer OR estose)) OR (mata OR (estaeoe OR gusta)))) point~

  1. 4941
  2. 4942
  3. 4943
  4. 4944

    Insectos asociados a biomodelos simulando cuatro condiciones de hallazgo de cadáveres. por Briones Espinoza, Héctor Eduardo

    Publicado 2018
    “…Due to the above, the arrival of insects to the different conditions of biomodels, the richness, and diversity of species, as well as the colonization and succession of insects, were aspects that were affected by the different environmental variables that occurred along the study, so it is important to take them into account when carrying out post-mortem time estimates (IPM).…”
    Enlace del recurso
    Tesis
  5. 4945
  6. 4946
  7. 4947
  8. 4948
  9. 4949
  10. 4950
  11. 4951
  12. 4952
  13. 4953
  14. 4954
  15. 4955
  16. 4956

    Alternativa de solución para reducción de costos de electrificación en áreas rurales por Sandoval Ortega, Ricardo

    Publicado 2007
    “…La problemática radica en el costo de construcción de la línea de media tensión en 33 kV , debido a la ubicación de la población (ubicado al noroeste del casco municipal), se encuentra a 50 km de la Subestación Arco Vial, por lo que el costo por km de la línea necesaria con los calibres mínimos de desarrollo que se tienen y que son ACSR 1/0 AWG en postes de concreto PC-13-600, es estimado en $ 209,369 por km (Octubre 2007) y para el total de longitud (50 km), el costo aproximado es cercano a los $10’468,450.00 pesos; sin considerar, las obras de la red de distribución (postes, líneas, transformadores, alumbrado público, etc.) dentro de la comunidad El Milagro que asciende aproximadamente a la cantidad de $ 605,194.79 pesos; dando un costo total aproximado para esta obra de $ 11’073,644.79 pesos. …”
    Enlace del recurso
    Tesis
  17. 4957
  18. 4958
  19. 4959
  20. 4960

Herramientas de búsqueda: