Search Results - ((estos OR testo) OR (este OR ((teste OR (esta OR testeasr)) OR (gtests OR restossn)))) point*

Refine Results
  1. 1

    The validity of incremental exercise testing in discriminating of physiological profiles in elite runners by Legaz Arrese, Alejandro, Munguía Izquierdo, Diego, Carranza García, Luis Enrique, Reverter Masía, Joaquín, Torres Dávila, Celeste Guadalupe, Medina Rodríguez, Rosa Elena

    Published 2011
    “…The goal of this study was to determine whether traditional ergoespirometric incremental exercise testing carried out to the point of exhaustion could be useful in distinguishing the physiological profiles of elite runners that compete in races that lasted about 8 minutes versus those that lasted about 2 hours. …”
    Get full text
    Article
  2. 2

    The validity of incremental exercise testing in discriminating of physiological profiles in elite runners by Legaz Arrese, Alejandro, Munguía Izquierdo, Diego, Carranza García, Luis Enrique, Reverter Masía, Joaquín, Torres Dávila, Celeste Guadalupe, Medina Rodríguez, Rosa Elena

    Published 2011
    “…The goal of this study was to determine whether traditional ergoespirometric incremental exercise testing carried out to the point of exhaustion could be useful in distinguishing the physiological profiles of elite runners that compete in races that lasted about 8 minutes versus those that lasted about 2 hours. …”
    Get full text
    Article
  3. 3

    A pico-satellite assembled and tested during the 6th CanSat Leader Training Program by Colín, Ángel

    Published 2017
    “…We registered a humiditydifference of ∼5%, measured between the maximum height and the landing point. The flight pattern was projected to a plane that covers an areaof 50 m × 50 m by means the coordinates of a GPS.© 2016 Universidad Nacional Autónoma de México, Centro de Ciencias Aplicadas y Desarrollo Tecnológico. …”
    Get full text
    Article
  4. 4

    A pico-satellite assembled and tested during the 6th CanSat Leader Training Program by Colín, Ángel

    Published 2017
    “…We registered a humidity difference of ∼5%, measured between the maximum height and the landing point. The flight pattern was projected to a plane that covers an area of 50 m × 50 m by means the coordinates of a GPS.…”
    Get full text
    Article
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11

    Puntos de vista de la responsabilidad social corporativa (Points of view on social corporate responsibility by García González, Mayra Elizabeth

    Published 2005
    “…This study has the objective ofpresenting the differents points of view about Corporate Social Responsibility (CSR) in the business world. …”
    Get full text
    Article
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18

    Análisis geomecánico utilizando el método RMR, de un macizo rocoso ubicado en el km 40 de la carretera Linares – Iturbide. by Garza Pérez, Magdaleny

    Published 2017
    “…The RMR (ROCK MASS RATING) method proposed by Bieniawski in the 80's will be used as a parameter to classify the quality of the rock mass from a geological engineer point of view, so with complementary data to establish the parameters of the rocky mass for the purpose of slope stability, determining the degree of risk and generating necessary measures to deal with possible damages that could be generated. …”
    Get full text
    Tesis
  19. 19

    Análisis geomecánico utilizando el método RMR, de un macizo rocoso ubicado en el km 40 de la carretera Linares – Iturbide. by Garza Pérez, Magdaleny

    Published 2017
    “…The RMR (ROCK MASS RATING) method proposed by Bieniawski in the 80's will be used as a parameter to classify the quality of the rock mass from a geological engineer point of view, so with complementary data to establish the parameters of the rocky mass for the purpose of slope stability, determining the degree of risk and generating necessary measures to deal with possible damages that could be generated. …”
    Get full text
    Tesis
  20. 20

    Intangibles en la valoración financiera de proyectos de inversión (Intangibles in the financial valuation of investment projects) by Ceballos Hornero, David, Ramírez Sarrió, Dídac

    Published 2011
    “…Financial risks (market, credit or operational) are discounted thought probability, risk premium or stress testing. This point of view is far, a priori, from a social and success perspective of the investment, because of the uncertainty only affects to data (time, money and interest rate). …”
    Get full text
    Article

Search Tools: