Resultados de búsqueda - ((((slost OR plote) OR (spote OR slostee)) OR ((lot OR post) OR blot)) OR (dflor OR olor))*

Limitar resultados
  1. 1

    Lot production size problem and simulation of urban transport por Morales Marroquín, Miguel Lorenzo

    Publicado 2015
    “…OBJECTIVES AND STUDY METHOD: There are two subjects in this thesis: “Lot production size for a parallel machine scheduling problem with auxiliary equipment” and “Bus holding for a simulated traffic network”. …”
    Enlace del recurso
    Tesis
  2. 2

    Lot production size problem and simulation of urban transport por Morales Marroquín, Miguel Lorenzo

    Publicado 2015
    “…OBJECTIVES AND STUDY METHOD: There are two subjects in this thesis: “Lot production size for a parallel machine scheduling problem with auxiliary equipment” and “Bus holding for a simulated traffic network”. …”
    Enlace del recurso
    Tesis
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18

    Rehabilitación cardíaca fase 2 post infarto agudo al miocardio por Gutiérrez Arce, Kirby, Estefanía Funez, Jessy, Rojas Aboite, Cristian Yovany, Hernández Cortés, Perla Lizeth, Enríquez Reyna, María Cristina

    Publicado 2021
    “…Se propuso analizar la información disponible sobre protocolos de ejercicio diseñados para ofrecer rehabilitación cardiaca fase II para pacientes post infarto agudo al miocardio fase II con el propósito de identificar las características de los programas de entrenamiento y los resultados relativos a la recuperación del funcionamiento cardiaco (fracción de eyección, capacidad respiratoria) y metabólico (glicemia). …”
    Enlace del recurso
    Artículo
  19. 19
  20. 20

Herramientas de búsqueda: