Search Results - (((((este OR estedas) OR ttesteeem) OR (testan OR estas)) OR este) OR (est OR esta)) point*

  1. 21
  2. 22
  3. 23
  4. 24
  5. 25
  6. 26
  7. 27
  8. 28
  9. 29
  10. 30
  11. 31

    Estrategias para una sucesión exitosa en la empresa familiar = Strategies for a sucessuful succession in family business. by García, Mayra E.

    Published 2007
    “…The strategies proposed in this study are: Creating a Family Business Conseil; Choosing the succesor from an analitical point of view; Get pschicologist support in the succesion period; To create a Business Society; Partial Retirement of Director; An adequate compensation management; Open communication among all the members; and a provisional management. …”
    Get full text
    Article
  12. 32
  13. 33

    Aproximación al ciberactivismo feminista en Latinoamérica en el siglo XXI by Pila Guzmán, Paola Viviana, Estrada Esparza, Olga Nelly

    Published 2023
    “…Based on a first theoretical approach to cyberactivism, the differences between the concepts of feminist cyberactivism and cyberfeminism were analyzed. From this point, the historical connections were located between this digital and network activism and the contemporary feminist movement. …”
    Get full text
    Article
  14. 34
  15. 35
  16. 36

    Análisis geomecánico utilizando el método RMR, de un macizo rocoso ubicado en el km 40 de la carretera Linares – Iturbide. by Garza Pérez, Magdaleny

    Published 2017
    “…The RMR (ROCK MASS RATING) method proposed by Bieniawski in the 80's will be used as a parameter to classify the quality of the rock mass from a geological engineer point of view, so with complementary data to establish the parameters of the rocky mass for the purpose of slope stability, determining the degree of risk and generating necessary measures to deal with possible damages that could be generated. …”
    Get full text
    Tesis
  17. 37

    Análisis geomecánico utilizando el método RMR, de un macizo rocoso ubicado en el km 40 de la carretera Linares – Iturbide. by Garza Pérez, Magdaleny

    Published 2017
    “…The RMR (ROCK MASS RATING) method proposed by Bieniawski in the 80's will be used as a parameter to classify the quality of the rock mass from a geological engineer point of view, so with complementary data to establish the parameters of the rocky mass for the purpose of slope stability, determining the degree of risk and generating necessary measures to deal with possible damages that could be generated. …”
    Get full text
    Tesis
  18. 38
  19. 39
  20. 40

Search Tools: